Gongwer News Service
The Court of Appeals affirmed a trial court decision that said state agencies complied with requirements to develop a wind farm, overruling opposition on development from a local airport authority.
In Tuscola Area Airport Authority v. Pegasus Wind LLC, Michigan Aeronautics Commission and the Department of Transportation (COA Docket No. 373184), the court ruled the Tall Structure Act was followed and local authority could not override permit compliance.
Pegasus Wind applied to build a wind turbine farm in 2018 in the general vicinity of the Tuscola Area Airport, which required permits from different agencies including Tall Structure permits for its 62 wind turbines from the Michigan Aeronautics Commission, which delegated airspace reviews and approvals to the Michigan Department of Transportation.
To obtain the permits the Federal Aviation Administration conducted an impact study on the surrounding airspace and the wind company hired Capitol Airspace Group to study potential impact on aviation and airspace. Capitol Airspace’s study concluded the locations of 46 turbines would exceed certain height limits but suggested options to avoid impacting navigation, and the FAA issued a “Determination of No Hazard to Air Navigation” for each of the proposed turbines because it found the project would have “no substantial adverse effect on the safe and efficient utilization of the navigable airspace by aircraft or on the operation of air navigation facilities.”
MDOT then concurred that there was no hazard.
After the last of the permits were issued, the airport authority appealed MDOT’s final decision to the Ingham County Circuit Court. While the circuit court first dismissed the local airport as not an aggrieved party in the matter, the airport won an appeal in the Supreme Court that claimed they had standing, remanding it back to the circuit court.
The airport claimed MDOT violated the Tall Structure Act when it issued the permits without first conducting an independent airspace study and making a finding of noninterference in writing. MAC and MDOT both acknowledged that they did not prepare a written airspace study but argued they complied by doing other reviews.
The circuit court sided with the state, saying the statute does require MDOT to conduct a certain kind of study or to issue a certain report, but does not set the standard that the airport authority was seeking.
In a published unanimous decision written by Judge Kathleen Feeney, she wrote the act does not define an airspace study and that “MDOT’s collective actions — reviewing Pegasus’s application, evaluating the studies by the FAA and Capitol Airspace, holding a meeting of its airspace review team, and compiling a 955-page document of evidence it relied on when it granted the application — constitute making or conducting a study as required by the act.”
The act also does not specify that the airspace study must be in writing, Feeney wrote.
The precedent against local governmental authority in general has already been solidified in other cases, including an order this month where the Michigan Supreme Court declined to hear a challenge by local governments over Public Act 233 renewable energy siting, which gives siting power to the state for wind, solar and battery projects.
––––––––––––––––––––
Subscribe to the Legal News!
https://legalnews.com/Home/Subscription
Full access to public notices, articles, columns, archives, statistics, calendar and more
Day Pass Only $4.95!
One-County $80/year
Three-County & Full Pass also available